Every grid operator.
One platform.
Hand over your installations through the WISNOTS platform. Upload the documents you already have. We read them, create the site plan, choose the right metering concept and attach the datasheets. If anything is missing, we get it ourselves, from your customer or from you. After that you see every installation and its status, all the way to approval.
From paper to approval.
In one place, without portals and without retyping.
In four steps
- Step 1
Store your logins
Store your portal logins and your entry in the installer register once. We use them for every registration with the respective grid operator.
- Step 2
Upload the installation
Upload the documents you already have. We read them, create the site plan, choose the right metering concept and attach the datasheets. If anything is missing, we get it ourselves, from your customer or from you. The registration is charged as soon as you hand it over.
- Step 3
Track the filing
We file with the grid operator and answer its queries. You see every step with its date and document.
- Step 4
Receive the approval
The approval lands straight in the case. After commissioning, the completion notice and the entry in the Market Master Data Register follow.
Pricing
€60 per registration.
Everything included.
plus VAT
How billing works
- On handover
- You are charged as soon as you hand an installation over to us.
- PV with storage
- Counts as one registration, not two.
- No commitment
- No minimum term and no minimum volume. You only pay for the installations you hand over.
1 × grid registration
- Filing with the grid operatorincludedWe file with the responsible grid operator under your registration, by portal or by form.
- Queries and follow-up requestsincludedWhatever the grid operator asks for, we answer. You only hear from us if something is missing that only you have.
- Completion noticeincludedAfter commissioning, we report the installation as complete to the grid operator.
- Market Master Data RegisterincludedWe register the installation within one month of commissioning.
Who we are
The founders of WISNOTS.
We come from the energy industry, where we automated processes for energy suppliers. Now we do the same for the businesses that build the installations.
Call me or message me on WhatsApp or by email.

FAQ
Basics
A grid registration is the application to the responsible grid operator to connect an installation to the power grid and operate it. It covers photovoltaic systems, battery storage, heat pumps, wallboxes and charging stations, and every change to an existing installation. The grid operator checks whether its grid can take the installation at the planned location, and approves or sets conditions. A grid registration has several steps: the connection request before construction, the completion notice and the commissioning notice once the installation runs, and for photovoltaics and storage the registration in the Market Master Data Register. Queries from the grid operator are part of the normal process: only once they are answered and missing documents are submitted does the approval come.
Every installation that feeds power into the grid has to be registered, and every larger consumer. Photovoltaic systems need a connection request before construction, then the commissioning notice under VDE-AR-N 4105 and the registration in the Market Master Data Register. Battery storage is registered the same way, on its own or together with the PV system. Wallboxes and other charging stations have to be registered from 3.7 kW, and from 12 kW you need the grid operator's consent beforehand. Heat pumps are registered with the grid operator and, as controllable consumers, fall under § 14a EnWG, as do wallboxes, battery storage and air conditioners above 4.2 kW. Heat pumps, storage and charging points already installed can be registered under § 14a afterwards. Changes to an existing installation also have to be reported to the grid operator: adding modules, a change in output, retrofitted storage or a change of operator. A new house connection, or a change to an existing one, has its own application, with the meter cabinet and the meter request.
With 100 % of the grid operators in Germany and Austria. Each has its own portal, its own forms and its own requirements. You do not need to know them, that is our job, and the price is the same everywhere.
Process
Usually the electrical contractor who builds the installation and is listed in the grid operator's installer register. With WISNOTS that stays the same: you remain the applicant, we work on your behalf and file under your registration.
Under your registration. You store your logins for the grid operator's portal with us, encrypted. We only use them to work on your cases. You can change or block the access at any time. Your registration and your responsibility stay as they are.
For each installation you upload the documents you have. We check them, file with the responsible grid operator and take care of everything else. In the dashboard you see at any time where each case stands.
Send us what you have. If anything is missing, we get it ourselves: either straight from your customer, in your name, or from you, if only you have it.
No. You remain the applicant, we work on your behalf. If anything is missing, we contact your customer directly in your name, or you.
That comes to us, not to you. We handle queries and follow-up submissions.
Data and responsibility
Yes. You remain the controller under data protection law, we are the processor and act only on your instructions. This is covered by a data processing agreement under Art. 28 GDPR, which takes effect when you sign up. You do not need to sign or prepare anything for it.
The case data is stored in the EU (Ireland), our server functions run in Frankfurt. The AI processing runs through an EU endpoint, exclusively with models in EU data centres. Emails are sent from Ireland.
If the mistake is ours, we rework the case and file it again at no extra cost. What we cannot answer for: the accuracy of the information that comes from you or your customer, and the grid operator's decision itself.
Leave your next
grid registration
to us.
Create an account, store your logins, upload your first installation. No minimum term, no minimum volume.